Medigadda Project Has Been Leaking Ever Sonce It Was Built: Eatala

Hyderabad, Oct 23 (Maxim News): Senior BJP MLA and chairman of the party’s election management committee, Eatala Rajender said that the collapse of the Medigadda (Lakshmi) barrage bridge, which is the most important part of the Kaleswaram project, s worrying.

Speaking to media persons at the BJP State office in Nampally, He criticized the Kaleswaram project started with the narrow aim of making a name for themselves.

He said we went to inspect the Medigadda barrage on Sunday.  In the past, Visveswara Reddy has raised doubts many times. When Chief Minister K. Chandrasekhar Rao spoke on Kaleswaram, experts warned about its construction.  some of the projects were given to some in the allocation method. Nagarjunasagar Dam is still intact despite the use of any technology. Three projects in Kaleswaram were built in a very short time and dedicated to the nation.  The selection of the project site was done with discretion. Medigadda barrage has been leaking ever since it was built.  the project was built on sand.  the entire Kannepally pump house collapsed. Then Section 144 was imposed to prevent the experts from entering the vicinity of the pump house. They tried to hide the truth.

Due to the KCR government; ‘s mistake, there is a loss of Rs. one lakh crore.  the condition of the project today is proof of construction defects.  The projects remain mere tourist spots. People need to be told the facts about projects built with public money.

He alleged that Chief Minister K. Chandrasekhar Rao was the reason for this failure. The CM should take responsibility for this incident and resign from his post. Etala demanded that an expert committee should be formed and a white paper should be released on this incident. (Maxim News) 


Next Story :

  • Motorola Launches Edge 50 Fusion As Latest Edition

    Motorola Launches Edge 50 Fusion As Latest Edition

    Motorola today launched the motorola edge 50 Fusion as the latest edition to its premium edge franchise.


  • IIITH Announces Product Management Summer School

    IIITH Announces Product Management Summer School

    Hyderabad, May 16, 2024: International Institute of Information Technology Hyderabad (IIITH) announced the launch of a 4-week Product Management Summer School, jointly with Product Leaders Forum (PLF) and Hyderabad Software Enterprises Association(Hysea). Registrations are open, the summer school starts on 25 May 2024.


  • Project Swayam: Walchand Plus Empowering Youth for a Sustainable Future in the Green Sector

    Project Swayam: Walchand Plus Empowering Youth for a Sustainable Future in the Green Sector

    Mumbai, May 2024: In a bold step towards a sustainable future, The Bahubali Gulabchand Foundation, in partnership with Walchand Plus, celebrates the early triumphs of ‘Project Swayam’—an innovative initiative aimed at cultivating a skilled youth workforce for India’s burgeoning green energy sector.


  • Admissions Open for MA Arabic in MANUU

    Admissions Open for MA Arabic in MANUU

    Hyderabad: Maulana Azad National Urdu University (MANUU), Department of Arabic is offering admissions to MA in Arabic. The last date for submitting online application form for merit based programme MA (Arabic) is June 30, 2024.


Now you can get the latest stories from Indtoday on Telegram every day. Click the link to subscribe.  Click to follow Indtoday’s Facebook pageTwitter and Instagram. For all the latest Hyderabad News updates

Leave A Reply

Your email address will not be published.