HomeTelangana NewsBandi Sanjay Given Green Signal For New Railway Line Between Karimnagar To...

Bandi Sanjay Given Green Signal For New Railway Line Between Karimnagar To Hasan Parthi

Delhi/Hyderabad, May 12 (Maxim News): The State President of BJP and Karimnagar MP Bandi Sanjay has given the green signal for laying the new Railway line between Karimnagar to Hanamkonda district for which the Railways has sanctioned Rs/ 1.54 crore for the survey of the final location of the 61.80 km railway line.

if the land acquisition, track and station construction works are completed quickly, the train will be laid from Karimnagar to Hanumakonda district in a few years.

It may be recalled that the BJP State president and Karimnagar MP along with Railway Minister Ashwini Vaishanav in Delhi submitted a petition to build this line. With this, the Railway minister ordered the officerts of the South Central Railway to conduct a resurvey and prepare a report on the construction of the new railway line on war footing. The pending project seems to have been saved as the funds have been sanctioned recently.

Although a survey was done in 2013 regarding the construction of karimnagar-Hasanparthi railway line, the work did not progress after that. There is a mention of the construction of this line in the State Redistricting Act. This line, which is about 62 kilometers long, will be very convenient for the people of the combined Karimnagar and Warangal districts. The transportation of granite, rice, maize and other crops in Karimnagar district will be easy. At present, to go to Mumbai from Kazipet Junction, one has to go via Secunderabad via Nizamabad.

If this line is completed. you can go to Mumbai via Karimnagar, Karimnagar – Nizamabad railway line has already been completed, Kothapalli-Manoharabad track work has speedup. If the recently approved karimnagar-Hasanparthi line is also completed, the rail services will be more accessible to the residents of Karimnagar.

JOINT KARIMNAGAR AND WARANGAL DISTRICTS ARE BENEFICIAL

Although a survey was done for the construction of this railway line in 2013, the project did not get the green signal due to the negligence of the BRS government. Keeping in mind the importance of this line, we have submitted requests to the Union Minister of Railways several times. If this construction is completed, it will be very beneficial for the people of combined Karimnagar and Warangal districts. Special thanks to Railway Minister Ashiwini Vaishnav who approved the project when asked. (Maxim News)


Next Story :

  • Air Force Officials Survey Land For Adilabad Airport

    Air Force Officials Survey Land For Adilabad Airport

    Air Force officials conducted an aerial survey in Adilabad as preparations advance for the proposed Adilabad Airport project.


  • Cyber Fraudsters Posing As ACB Officials Dupe Engineer Of Rs 10 Lakh

    Cyber Fraudsters Posing As ACB Officials Dupe Engineer Of Rs 10 Lakh

    Cyber fraudsters posing as ACB officials allegedly duped a Hyderabad engineer of Rs 10 lakh by threatening surprise raids.


  • F1 Dutch GP: Antonelli Tops Only Practice at Zandvoort

    F1 Dutch GP: Antonelli Tops Only Practice at Zandvoort

    F1 Dutch GP | Hyderabad, August 21: F1 Dutch GP weekend began with Mercedes driver Kimi Antonelli setting the fastest time in Friday’s only practice session at Zandvoort. Here To Join Us On WhatsApp Antonelli clocked 1:12.949 to finish ahead of McLaren’s Lando Norris and Mercedes teammate George Russell. Antonelli edged Norris by 0.121 seconds…


  • Hyderabad Land Prices: Raidurg Plot Sets Rs. 264 Crore Record

    Hyderabad Land Prices: Raidurg Plot Sets Rs. 264 Crore Record

    Hyderabad, August 21: Hyderabad land prices have reached a new high after an acre in Raidurg sold for ₹264 crore. The Telangana Industrial Infrastructure Corporation conducted the latest auction in the city’s IT corridor. Here To Join Us On WhatsApp The record sale took place at Pan Maktha in Raidurg. The plot falls under Survey…


  • Kareena Kapoor Khan Not Pregnant, Team Confirms

    Kareena Kapoor Khan Not Pregnant, Team Confirms

    Hyderabad: Kareena Kapoor Khan is not pregnant, her team has confirmed, putting an end to recent speculation about her expecting a third child with actor Saif Ali Khan. Here To Join Us On WhatsApp Rumours began circulating online after a recent video showed Kareena returning to her car. A member of her team appeared to…


Now you can get the latest stories from Indtoday on Telegram every day. Click the link to subscribe.  Click to follow Indtoday’s Facebook page and Twitter and Instagram. For all the latest Hyderabad News updates

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisment -
germanten flyer 3
previous arrow
next arrow

Most Popular

Recent Comments