Bahadurpura flyover to be ready by March end

Hyderabad: A six-lane bidirectional flyover at Bahadurpura is fast nearing completion, with the facility expected to ease traffic chaos that have been hounding the Old City for decades.

The construction of the flyover is in the final stage, with authorities targeting to complete the much-awaited project by March 31, said the Greater Hyderabad Municipal Corporation (GHMC) officials.

Being constructed as part of the Strategic Road Development Plan (SRDP) project, the Bahadurpura flyover is being built by the GHMC at an estimated cost of Rs 69 crore. The 690-metre flyover will bring much needed relief to commuters moving in different directions via the busy Bahadurpura junction. People visiting the Nehru Zoological Park will also benefit from the flyover, officials said.

“While the laying of the foundation, ramps, crash barriers and friction slabs have been completed, some civic works are underway at a brisk pace. Once the facility is made available to people, the traffic at Bahadurpura junction will ease,” said Dattu Panth, GHMC Superintending Engineer, Projects Wing (Charminar Zone).

“On the Bahadurpura road, many travel/tourist buses and heavy vehicles including lorries are parked. Apart from this, the area has developed over the last few years increasing the traffic and footfall in the region. This flyover will ensure smooth travel, reduced commute time and decrease pollution,” officials said.

To build the flyover, 45 properties were acquired and Telangana State Southern Power Distribution utilities had to be shifted. Meanwhile, to deck up the flyover, plans are underway to develop greenery under it and also set up vertical gardens on the pillars of the structure.

This is not the lone project that is underway in Bahadurpura. Another flyover stretching over 4.048 kilometres on the Aramghar to Nehru Zoological Park stretch is also under construction. This will be the second-longest flyover in the city after the 11.6km PVNR Expressway.


Next Story :

  • 60-Year-Old Stripped, Tied To A Motorcycle, For ‘Cow Smuggling’ 

    60-Year-Old Stripped, Tied To A Motorcycle, For ‘Cow Smuggling’ 

    Garhwa/Hyderabad, May 19 (Maxim News): A 60-year-old man was allegedly stripped and dragged after being tied to a motorcycle by three persons on suspicion of cow smuggling in Jharkhand’s Garhwa district, police said on Sunday.


  • A Teenager Died Of Snake Bite 

    A Teenager Died Of Snake Bite 

    Hyderabad, May 19 (Maxim News):  A teenager died of a snake bite at Kandukur in Ranga Reddy district on Sunday.


  • Three Died Due To Lightning In Vikarabad 

    Three Died Due To Lightning In Vikarabad 

    Hyderabad, May 19 (Maxim News): A tragedy took place in the Vikarabad district. Three people were killed in a lightning strike due to heavy rain in the district.  Another was seriously injured.  This tragic incident took place in Yalal Mandal on Sunday.


  • Heavy Rain In Hyderabad

    Heavy Rain In Hyderabad

    Hyderabad, May 19 (Maxim News): It is raining in many places in Hyderabad. The whole city is covered in clouds.  The Meteorological Department has warned that there is a chance of heavy rain. Currently, heavy rain has been falling in Suchitra, Kompalli, jeedimetla, Pet Basheerabad, and Bahadur Palli for about half an hour.  On the other…


  • Youth Hunger Strike To Remove Belt Shops

    Youth Hunger Strike To Remove Belt Shops

    Rangareddy/Hyderabad, May 19 (Maxim News): A young man protested in an innovative way that because of the belt shops in the village, young people to old people are getting sick after drinking alcohol. A youth named Naveen from Tindivanam village of Farooq Nagar Mandal of Rangareddy district went on a hunger strike to remove the belt shops…


Now you can get latest stories from Indtoday on Telegram everyday. Click the link to subscribe.  Click to follow Indtoday Facebook page and Twitter and on Instagram. For all the latest Hyderabad News updates

Leave A Reply

Your email address will not be published.